News

BV50”/150LB pipeline ball valve was successfully delivered

Time: 2020.09.27     View: 2834



        Recently, the BV50”/150LB forged steel ball valve produced by JEV successfully passed the final inspection of the quality assurance system and had passed the third-party inspection before. Afterwards, it is packed, lifted, and loaded onto the truck to complete all tasks for shipment. The successful manufacture of the large-caliber ball valve benefited from team cooperation, equipment updates, agility and professionalism of the supply chain, and technical innovation. The smooth delivery of the valve marks a new level of JEV's manufacturing, supply chain, and organizational capabilities.

RETURN